Specification | DSW-120M | DSW-75M | DSW-20M |
Measuring range N・m (at the time of Track) | 3.0 - 120 N・m | 0.30 - 75 N・m | 0.30 - 20 N・m |
301~1200 kgf・cm | 3.0~750 kgf・cm | 3.0~200 kgf・cm |
30~1080 lbf・in | 3.0~650 lbf・in | 3.0~180 lbf・in |
*A measurement unit is fixed to one unit. Specify when ordering | |
Accuracy | ±0.5% (F/S) (199 or less digit±1digit) | ±0.5% (F/S) (499 or less digit±3digit) | ±0.5% (F/S) (199 or less digit±1digit) |
Display | The 4 figures digital display of LCD | |
The measurement direction | CW-CCW (right and left) | |
Measuring mode | P-P Peak | Holding Peak Load Value | |
T-R Track | Showing Real time torque value ( Used for Zero-Adjustment ) | |
P-D Peak down | Holding Load Value at the moment to change from upward to downword | |
C Real-time output | Load torque value is outputted every about1/ 70 second by RS232C | |
Decision function | Setting of torque value | Programmable High and Low setpoints with both audible beep and Green/ Red LED indicator for uniform torque tightening or GO/NO GO testing | |
The Maximum, the minimum, and the average value | Displays, memory and output the data number, the maximum, the minimum, and the average value of the measured value to 30 data. It can save by a maximum of 10 channels. | |
Data spec. | Data transfer | Serial interface RS232C (Baud rate : 9600) | |
Data memory | 300 data / ten channels data | |
A setup of the number of counts | One to 99 count (count in a direction with a bundle) | |
Power supply | 6 VDC (Ni-Cd chargeable battery 1.2V×4cells 600mAh) | |
Auto power save | 10 minutes no use, automatically switch off. | |
Charging time | From empty - less than 5hours | |
Continues working time | 12 hours | |
Outside size | φ34(grip)×440(L) | φ34(grip)×305(L) | φ28(grip)×231(L) |
Socket engagement | 12.7 square, including steel ball | 9.5 square, including steel ball | |
Weight | 830g | 570g | 370g |
Attachment | - | One-way socket | |
Accessories (one piece each) | AC/DC adaptor (Please choose AC adaptor out of 120V, and 230V.) | |
An inspection report, a proofreading certificate, a traceability system figure | |
| | | | | |